Timber Road IV Wind Farm
Overview
- Name: Timber Road IV Wind Farm
- Client: GEO
- Contract Value: CA$ 744.5 million
- Contract Type: EPC
- Sector: Power & Energy
- Timeline: March – 2018 – June- 2020
- Location: PAULDING, OHIO
Description:
Timber Road IV is EDP Renewables fourth operational wind farm in Ohio. These facilities generate more than 40 percent of the state’s installed wind energy. Falex constructed as a sub-contractor this 125-megawatt wind farm that produces enough electricity to power over 36,000 homes annually.
The scope included civil, concrete and mechanical work for 31 Vestas turbines, as well as engineering and procurement of meteorological towers that gather wind data from the site.